Design Your Factory
Set the load, the platform and the redundancy. The site plan, the hall, the single line and the rack redraw as you choose.
Single tenant · 15–100MW · Power first
IT load
Phases land whole. Phase 01 is one hall. Phase 02 completes building 1. Phase 03 adds building 2.
Platform
Rack density
132 to 140 kW nominal. About 155 kW peak.
Power
Standby generation
Ride-through · UPS
Cooling redundancy
Delivery
Every on-ramp is single tenant. Unlike colocation, no other customer shares your halls or your plant.
Swarm Systems045-GB300-2N-GNP1-CNP1SetA-101 Site plan · Rev A · NTS
45MW · GB300 NVL72 · 2N · Turnkey Halls
- IT load
- 45MW
- Phase 02
- Facility
- 54MW
- PUE 1.20
- Racks
- 324
- 140 kW each
- GPUs
- ≈23,300
- 72 a rack
- Halls
- 3
- of 6
- Generators
- 24
- N+1
- Transformers
- 46
- 2N
- Chillers
- 27
- N+1
Indicative planning figures · not a quote